Everything that goes into a bathroom, from where the drain sits to which side of the mirror the light belongs on. Read it before you speak to anyone, including us.
Start here. Everything else follows from where the wet zone goes.
A bathroom is decided by drainage. Moving the soil stack is expensive and sometimes prohibited outright in a Dubai tower, so the layout usually has to work around where the waste already is.
The layer you never see and cannot skip.
This is the most commonly skipped step in a cheap renovation and the cause of most leak damage in Dubai apartments. Tiles and grout are not waterproof. The membrane underneath is.
It has to survive standing water, not just spills.
Anything going on a bathroom floor needs a low slip rating when wet. Check the building rules too: some Dubai towers require acoustic underlay under hard flooring.





Where most of the surface area is.
Full-height tiling in the wet zone is non-negotiable. Beyond that it's a choice between tile, seamless finishes and paint — and the labour gap between them is larger than the material gap.
The part of the room that gets used every day.
Frameless glass and a level entry read as expensive but cost little more than the alternatives. What costs money is the ceiling void a rainfall head needs, and the falls in the floor a wet room needs.
Worth having, if the room can genuinely take one.
A freestanding bathtub needs clearance on all sides and a floor that can carry it filled. In a Dubai apartment, an alcove tub is usually the honest answer.
Storage is what a bathroom renovation usually gains.
Style, finish and top are three separate choices. A floating vanity in gloss white and one in oak with a stone top are the same unit with entirely different results.
Small item, large effect on how the room reads.
A wall-hung pan needs a concealed frame built into the wall, which costs more and takes space, and gives you a clear floor to mop. Decide before the blockwork.
Finish first, then the pieces.
Pick one metal finish and hold it across taps, shower, hinges, towel rails and hooks. Mixed metals almost never look deliberate in a room this small.
The difference between a bathroom and a good one.
One ceiling light behind you puts your face in shadow at the mirror, which is the one thing a bathroom mirror exists for. Light the face from the front or the sides.
A standard apartment bathroom takes 5–10 working days. Larger bathrooms, or any with layout changes, take 2–3 weeks. The timeline is confirmed before work starts.
Yes. We renovate one bathroom at a time, so your other facilities stay usable throughout.
Yes, and we treat it as non-negotiable. Every bathroom gets proper membrane waterproofing before tiling. It is the most commonly skipped step in cheap renovations and the cause of most leak damage in Dubai apartments.
Yes. We work to your aesthetic, whether that is modern minimalist, warm Japandi or classic marble, and can advise on tile and fixture combinations if you want guidance.
For structural changes such as moving walls or relocating plumbing stacks, jointly owned buildings may require permission from building management. We advise on this at consultation.
Send a few details and we'll come back with a clear, itemised estimate — no hidden costs, no pressure. Photos of the room help us quote faster and more accurately.
Fastest route. Most messages get a reply within the hour on working days.
The design tool lets you specify the room down to the individual tile and see the cost before you speak to anyone.